Executive Summary
Our geothermal project will generate significantly more thermal capacity than the primary development requires. We propose to monetise this surplus by supplying hot water to a neighbouring planned vacation home community of 50 homes across two clusters. The developer of that community has indicated willingness to co-invest in the distribution infrastructure, which materially de-risks the project and compresses the payback period to approximately 10–11 years on a shared CAPEX basis — well within the operational lifespan of the asset (30–40 years).

This is a low-marginal-cost, recurring revenue stream built on zero-cost fuel.


Project overview

Parameter Detail
Heat source Geothermal (surplus capacity from primary project)
Customers — Phase 1 25 vacation homes, Cluster A
Customers — Phase 2 25 vacation homes, Cluster B
Distance to Cluster A 800 m from source
Distance to Cluster B 1,700 m from source
Billing model Fixed annual subscription + flow capacity
Developer role Co-investor in pipeline infrastructure (50% CAPEX)

Capital expenditure

Item Total Cost Developer (50%) Our Share (50%)
Trunk line, Source → Cluster A (800 m) €524,800 €262,400 €262,400
Extension, Cluster A → Cluster B (900 m) €590,400 €295,200 €295,200
Internal distribution, Cluster A €173,700 €86,850 €86,850
Internal distribution, Cluster B €173,700 €86,850 €86,850
Pump station & substations €65,000 €32,500 €32,500
Metering cabinets (50 homes) €75,000 €37,500 €37,500
Total €1,602,600 €801,300 €801,300
Less: Connection fees collected (50 × €3,200)     –€160,000
Net CAPEX outlay     €641,300

Build is phased: Phase 1 (Cluster A, ~€801k) triggers on Cluster A construction start; Phase 2 (Cluster B) triggers on Cluster B confirmation. No idle capital.


Revenue & Financial Projection

Revenue Item Annual
Subscriptions — 40 standard homes (×€1,450/yr) €58,000
Subscriptions — 10 hot tub homes (×€1,750/yr) €17,500
Gross Revenue €75,500
Operating costs (maintenance, pumping, admin) –€15,000
Net Annual Income €60,500
Financial Metric Value
One-time connection fee income €160,000
Net annual income (steady state) ~€60,500
Net CAPEX after connection fees €641,300
Payback period ~10.6 years
Revenue from year 11 onwards Near-pure margin
Asset operational life 30–40 years

Why the developer co-invests
The developer’s motivation is straightforward. In Iceland, geothermal hot water access is a market baseline expectation — lots without it sell at a meaningful discount. Based on regional comparables, reliable hot water supply adds an estimated €15,000–€25,000 per lot in realised sale value. Across 50 lots, that represents a €750k–€1.25M uplift in gross development value — making a €800k infrastructure contribution not just reasonable, but commercially rational. We are effectively subsidising their product quality.

This alignment of interests is a structural strength of the deal.


Key strengths

  • Zero fuel cost. The heat is a by-product of our existing geothermal investment. Marginal cost of production is effectively nil.
  • Recurring, inflation-linked income. Subscription tariffs are typically indexed to energy price benchmarks. Utility revenues are sticky and predictable.
  • Captive customer base. Once connected, switching costs are prohibitive. Customer churn is essentially zero.
  • Developer co-investment halves our exposure and signals strong demand validation before a single pipe is laid.
  • Phased build eliminates idle capital risk. Phase 2 is only committed when Cluster B development is confirmed.
  • Enhances our own project’s social licence. Community benefit strengthens planning relationships and long-term operating position.
  • Gateway asset. Once operational, additional projects in the area will find our infrastructure already in place, with extension economics improving per additional customer.

Risks & mitigants

Risk Likelihood Mitigant
Developer delays Phase 2 or backs out Medium Phase-gate agreements; Phase 1 is independently viable
Connection take-up below 100% Medium Mandatory connection covenant in lot sale contracts
Hot water chemistry unsuitable for bathing Low–Medium Test borehole water pre-commitment; heat exchanger option
Regulatory licence requirement (Orkustofnun) Low–Medium Early engagement with regulator; licence process is established
Pipeline CAPEX overrun Medium Fixed-price contractor quotes locked before commitment; 10% contingency
Developer seeks equity/pricing control Medium Contribution structured as infrastructure grant, not equity; ownership stays with us
Phase 2 development delayed 3–5 years Medium Phase-gating means no stranded capital; Phase 1 payback unaffected

Strategic upside (not in base case)
10 existing vacation homes in the wider area were judged too dispersed and few to connect at present. As our network grows and additional developments emerge, incremental connections become progressively cheaper per home.

  • Future developments attracted by proven geothermal infrastructure can be connected on similar commercial terms — each new customer improves the network economics for all parties.
  • Carbon credit potential. Displacing oil or electric boiler heating with geothermal may qualify under relevant Icelandic or European carbon mechanisms — upside not yet quantified.

Summary verdict
This is a long-duration, low-risk infrastructure asset generating clean recurring income from a zero-cost fuel source, with a co-investing partner whose financial interests are directly aligned with ours. The 10.6-year payback on net invested capital is conservative — and from year 11, the revenue stream runs largely unconstrained for a further 20–30 years.

The primary negotiation priority is the mandatory connection covenant in the developer’s lot sale contracts. That single clause converts a projected revenue stream into a contractual one — and that is the difference between a good investment and an excellent one.